Glendora / Shasta Pipe Capacity Improvements
Project Type:
Collection System and Pipeline
Project Schedule/Status:
Construction began in May 2018 and was completed in June 2019
Project Location:
Glendora Drive and Shasta Drive, San Mateo
Project Description:
As part of the Clean Water Program (CWP), approximately 2,000 feet of existing sewer pipes along Shasta and Glendora Drives were replaced and upgraded. This project replaced portions of the sewer pipes in City easements in Shasta Drive residents’ backyards or side yards with a new, larger pipe in the street. Improvements on Glendora Drive occurred in the street.
Most of the construction work took place in the public right-of-way, but the construction contractor needed to access the pipes in easements on affected properties as part of this work. After work was completed, Shasta Drive was repaved.
This project was crucial for improving the City’s overall infrastructure, and for preventing sewer overflows that occur during heavy rains. The CWP and the City of San Mateo want to thank all residents for their continued cooperation!